{"id":264,"date":"2021-06-21T12:13:09","date_gmt":"2021-06-21T10:13:09","guid":{"rendered":"https:\/\/strataspa.net\/settori-di-intervento\/ambiente\/"},"modified":"2021-10-25T10:21:35","modified_gmt":"2021-10-25T08:21:35","slug":"environment","status":"publish","type":"page","link":"https:\/\/strataspa.net\/en\/industries\/environment\/","title":{"rendered":"Environment"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">By vocation and strategic decision, STRATA is committed to developing infrastructure aimed at safeguarding the environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Its experience in this field concerns recovering and securing the territory, as well energy production, process intensification, and the production of alternative fuels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Particularly important within STRATA in this regard is the team dedicated to managing the relevant technical aspects and authorisation processes.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By vocation and strategic decision, STRATA is committed to developing infrastructure aimed at safeguarding the environment. Its experience in this field concerns recovering and securing the territory, as well energy production, process intensification, and the production of alternative fuels. Particularly important within STRATA in this regard is the team dedicated to managing the relevant technical [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":120,"parent":250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-ambiente.php","meta":{"footnotes":""},"class_list":["post-264","page","type-page","status-publish","has-post-thumbnail","hentry"],"meta_box":{"immagine_laterale_pagine":false,"pannello_accordion":[{"titolo_pannello":"Our Clients in this sector ","testo_pannello":"<h6 class=\"titolo-opera\">BIOGAS - PV INTEGRATED SYSTEM<\/h6>\r\n<p class=\"ditta-appaltante\">Universitatea de Siinte Agricole si Medicina Veterinara a Banatului Timisoara (Romania)<\/p>\r\n<p>Technical-economic feasibility study for a biogas plant (88 kW) and PV plant\u00a0 (150 kW) integrated system<\/p>\r\n<h6 class=\"titolo-opera\">UNIDO \u2013 PAKISTAN<\/h6>\r\n<p class=\"ditta-appaltante\">Sigra Group<\/p>\r\n<p>Evaluate a Waste-to-Energy supply opportunities for tanneries located in Karachi-Korangi e Sialkot Tannery Zone<\/p>\r\n<h6 class=\"titolo-opera\">UNIDO \u2013 Modjo Leather City, Ethiopia<\/h6>\r\n<p class=\"ditta-appaltante\">Sigra Group<\/p>\r\n<p>Evaluate a Waste-to-Energy supply opportunities for tanneries located in Modjo Leather City, Ethiopia<\/p>\r\n<h6 class=\"titolo-opera\">WASTE TREATMENT PLANT<\/h6>\r\n<p class=\"ditta-appaltante\">Ecosud S.A.<\/p>\r\n<p>Identification of technological solutions for the TMB plant and relevant new technical implementations<\/p>\r\n<h6 class=\"titolo-opera\">PALERMO \u2013 ENERGY EFFICENCY<\/h6>\r\n<p class=\"ditta-appaltante\">Envision S.r.l.<\/p>\r\n<p>Assignment of the energy efficiency interventions and management of the public lighting plant for the Municipality of Palermo<\/p>\r\n<h6 class=\"titolo-opera\">FORESTRY INTEGRATED PROJECT<\/h6>\r\n<p class=\"ditta-appaltante\">Eurolegna S.r.l.<\/p>\r\n<p>Technical-legal-administrative consultancy, within PSR Toscana, for the rationalisation of the production cycle in a circular economy context<\/p>\r\n<h6 class=\"titolo-opera\">CERIGNOLA WIND FARM<\/h6>\r\n<p class=\"ditta-appaltante\">Alerion Energie Rinnovabili s.r.l.<\/p>\r\n<p>Construction of the wind farm in Cerignola<\/p>\r\n<h6 class=\"titolo-opera\">WIND FARMS<\/h6>\r\n<p class=\"ditta-appaltante\">Alerion Industries S.p.a.<\/p>\r\n<p>Recognition of constraints and authorisations for wind farms<\/p>\r\n<h6 class=\"titolo-opera\">VOLTURARA APPULA WIND FARM<\/h6>\r\n<p class=\"ditta-appaltante\">Alerion Energie Rinnovabili s.r.l.<\/p>\r\n<p>Construction of the wind farm in Volturara Appula<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Consorzio Italcop\u00f2<\/p>\r\n<p>Study program for Padan Basin control<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Castalia S.p.a.<\/p>\r\n<p>Survey on reasons of toxic waste pollution, relevant disposal and site remediation<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Consorzio Ramsar Molentargius<\/p>\r\n<p>Implementation of the safeguard interventions in the Cagliari coast<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Sogin S.p.a.<\/p>\r\n<p>Legal-administrative support in the authorisation processes aimed at nuclear sites dismantling<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Techint S.p.A.<\/p>\r\n<p>Legal-administrative and procedural support for the cementation plant for radioactive liquid solutions<\/p>\r\n<h6 class=\"titolo-opera\">BIOMASS PLANT<\/h6>\r\n<p class=\"ditta-appaltante\">D\u2019Appolonia S.p.a.<\/p>\r\n<p>Support for the regional VIA and AIA for a biomass plant construction in Colle Val di Elsa<\/p>\r\n<h6 class=\"titolo-opera\">ALBERONA WIND FARM<\/h6>\r\n<p class=\"ditta-appaltante\">Alerion Energie Rinnovabili s.r.l.<\/p>\r\n<p>Construction of Alberona wind farm<\/p>\r\n<h6 class=\"titolo-opera\">MOLISE WIND FARM<\/h6>\r\n<p class=\"ditta-appaltante\">Norton Rose Studio L<\/p>\r\n<p>Construction of a wind farm in Molise Region<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Castalia S.p.A.<\/p>\r\n<p>Sea protection interventions<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Bonifica S.p.a.<\/p>\r\n<p>Interventions finalised at reducing floods along the Medio Tagliamento river<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Italtekna S.p.a.<\/p>\r\n<p>Formation of Valtellina plan and reconstruction program<\/p>\r\n<h6 class=\"titolo-opera\">ENVIRONMENTAL PROTECTION<\/h6>\r\n<p class=\"ditta-appaltante\">Bonifica S.p.a.<\/p>\r\n<p>Program for the safeguard of Venice Lagoon hydrogeological equilibrium<\/p>\r\n<h6 class=\"titolo-opera\">MEDITERRANEAN PROGRAM<\/h6>\r\n<p class=\"ditta-appaltante\">Italeco S.p.a.<\/p>\r\n<p>Mediterranean Integrated Program of Lazio Region<\/p>","icona_pannello":"508"}]},"_links":{"self":[{"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/pages\/264","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/comments?post=264"}],"version-history":[{"count":2,"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/pages\/264\/revisions"}],"predecessor-version":[{"id":266,"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/pages\/264\/revisions\/266"}],"up":[{"embeddable":true,"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/pages\/250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/media\/120"}],"wp:attachment":[{"href":"https:\/\/strataspa.net\/en\/wp-json\/wp\/v2\/media?parent=264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}